The opportunity to add to the green house
has come, whether a little at a time or
all at once it will get done.
I removed the brace and poly tarp I had temporally
across the back and cleared the way for
a permanent back wall
With this project I have found it easier to
pre-stain the lumber after cutting to length.
Using up all of the dark brown stain I had to use
some left over cedar stain to finish the job
With the soft top lifted I was ready to install
the 2x4 framing.
To keep it simple I over lapped two pieces
of glass fitted into the groove of the frame
which provides side to side coverage.
With the glass framed in and an upper
cross boards in place
it was time to reattach the soft top.
A look from the inside showing the new framing
that and my little garden
The next step will be to close it in completely
Stay tuned for part #4